HIGH DESERT MILK
- Site work. Layout, Compaction Testing, Excavate/Backfill Footings, Remove Existing slab, Vapor Barrier.
- Concrete. 250’ X 130’ Cooler, 120’ X 141’8” Plant, Footings and Foundation Walls W/Cold Joints, 22 Bollards, 2” Rigid Insulation Board (perimeter), Expansion Board (perimeter).
- Plant Building. 120’L X 141’8”W X 14’H Under False, Walk-able Ceiling, 26 ga. Standing Seam Roof Panels, 4” AWIP Double Mesa Profile Wall Panels, Primer Frame.
- Separate Rooms & Mezzanine. 141’8”L X 20’W w/Mezzanine Floor Height at 12’1”, Mezzanine Floor Deck w/ 4” Concrete, Lab= 36’6” X 20’, Bacteria Room= 10’8” X 20’, Precast Concrete Salt Room= 20’ X 20’, USDA Room= 11’ X 20’, MCC Room 20’ X 20’, Men’s Locker Room= 24’4” X 20’, Women’s Locker Room= 15’ X 20’, Hallway and Utility Corridor= 120’L X 12’11”W (connecting existing plant, new cooler, and new plant), Palletizing Room= 50’ X 35’.
- Cooler Building. Nucor Steel Building 250’L X 130’W X 40’H, Rain Gutter and Downspouts, 6” AWIP Double Mesa Profile Standing Seam Roof Panels, 6” AWIP Double Mesa Profile Wall Panels, Primer Frame, 84’L X 16’W Loading Dock w/Handrails.
We believe the greatest compliment is a customer referral. That's why we provide all customers with the absolute best service and highest quality work, at fair and competitive prices.