High Desert Milk
High Desert Milk Addition
High Desert Milk Addition, Burley, Idaho
High Desert Milk Addition Burley, ID
High Desert Milk Construction

High Desert Milk Addition
High Desert Milk Addition
High Desert Milk Addition, Burley, Idaho
High Desert Milk Addition, Burley, Idaho
High Desert Milk Addition Burley, ID
High Desert Milk Addition Burley, ID
High Desert Milk Construction
High Desert Milk Construction
>
<

Expanded Plant, Sale and Installation of Steel Structure, Site Dirt Work in Burley, Idaho, 2012

•    Site work- Layout, Compaction Testing, Excavate/Backfill Footings, Remove Existing slab, Vapor Barrier. <br>
•    Concrete- 250’ X 130’ Cooler, 120’ X 141’8” Plant, Footings and Foundation Walls W/Cold Joints, 22 Bollards, 2” Rigid Insulation Board (perimeter), Expansion Board (perimeter). <br>
•    Plant Building- 120’L X 141’8”W X 14’H Under False, Walk-able Ceiling, 26 ga. Standing Seam Roof Panels, 4” AWIP Double Mesa Profile Wall Panels, Primer Frame. <br>
•    Separate Rooms & Mezzanine- 141’8”L X 20’W w/Mezzanine Floor Height at 12’1”, Mezzanine Floor Deck w/ 4” Concrete, Lab= 36’6” X 20’, Bacteria Room= 10’8” X 20’, Precast Concrete Salt Room= 20’ X 20’, USDA Room= 11’ X 20’, MCC Room 20’ X 20’, Men’s Locker Room= 24’4” X 20’, Women’s Locker Room= 15’ X 20’, Hallway and Utility Corridor= 120’L X 12’11”W (connecting existing plant, new cooler, and new plant), Palletizing Room= 50’ X 35’. <br>
 •    Cooler Building- Nucor Steel Building 250’L X 130’W X 40’H, Rain Gutter and Downspouts, 6” AWIP Double Mesa Profile Standing Seam Roof Panels, 6” AWIP Double Mesa Profile Wall Panels, Primer Frame, 84’L X 16’W Loading Dock w/Handrails. </p>
         

Corporate Office
(208) 678 - 9204

Sales
(208) 431 - 7314

Address
120 South 100 West
Burley, Idaho 83318

Hours
Mon - Fri
8:00am - 5:00pm MST

 Related 
Quotation marks Streamline installed over 90,000 feet of PVC pipe and we are very satisfied with the result. I would recommend (and have recommended) Streamline Precision to others needing this type of work.Quotation marks

Bryce Beck, General Manager
Butte Irrigation

 Tags
Date Posted:
Sunday, Jan 31 2016
You might also be interested in: